News

Garber Announces Advisory Committee for Harvard Law School Dean Search

News

First Harvard Prize Book in Kosovo Established by Harvard Alumni

News

Ryan Murdock ’25 Remembered as Dedicated Advocate and Caring Friend

News

Harvard Faculty Appeal Temporary Suspensions From Widener Library

News

Man Who Managed Clients for High-End Cambridge Brothel Network Pleads Guilty

Abestos Removal Poses No Dangers

By Nathaniel L. Schwartz, Crimson Staff Writer

The signs, still posted in and around various Harvard houses after summer construction, warn ominously of asbestos removal efforts.

But students can rest easy; the asbestos cleanup over the summer was precipitated by a need to replace old equipment in rarely-used boiler rooms and does not represent a danger to students or employees, University maintenance officials said.

Asbestos--a fibrous mineral--was widely used as insulation during the mid-1900s. When its dust was found to be carcinogenic in the '60s and '70s, the insulation quickly fell in popularity.

Still, the material can often be found in older buildings, and by the '80s, health fears had spawned the new industry of "asbestos abatement."

At Harvard, many of the older classrooms and Houses were once insulated with asbestos, although the majority of the insulation was replaced long ago.

"Harvard's had an asbestos abatement program in place for more than a dozen years," said Philip W. Bisaga, the mechanical maintenance manager for the office of physical resources. "We've gone way beyond all code issues in asbestos abatement."

This means that no asbestos can be found in any of the areas that are widely used by either students or maintenance personnel. Most of Harvard's rooms have long been free from asbestos insulation. The remaining asbestos is mostly in unfrequented boiler and control rooms.

"The leftover asbestos can't cause any danger unless it's disturbed and the fibers are airborne. We aren't even obligated to replace it," said Gene G. Ketelhohn, the building manager in the houses.

In Pforzheimer House, trained asbestos handlers were called in over the summer to facilitate the replacement of worn-out equipment in these boiler rooms. Ketelhohn said the summer renovation will not completely eliminate asbestos from the Quad Houses under his jurisdiction, but he said he thinks it will bring the Houses close to that final goal.

"I can think of one big boiler room that I believe still has asbestos insulation," Ketelhohn said.

But according to Ketelhohn, this asbestos won't cause any problems.

"[The maintenance men] are very much aware of the danger," Ketelhohn said. They won't work near it after its been disturbed."

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags