News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
Power was restored to Lowell House at 3:45 a.m. yesterday, after nearly 5 hours of power trouble.
The Engineering and Utilities Department received a call reporting power failures in different parts of the house at 11 p.m.
Power problems began in a few entryways. According to students, power for the whole house went out soon after midnight.
Engineering and Utilities workers from Harvard's University Operations Services arrived shortly after 1 a.m. to assess the situation and had the power back on by 3:45.
--Warren S. Adler
Want to keep up with breaking news? Subscribe to our email newsletter.