News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
Harvard's P3 level laboratory for recombinant DNA research, which was originally scheduled to be completed last June, will not be ready for use until at least next spring, Richard G. Leahy, associate dean for the Faculty of Resources and Planning, said yesterday.
The P3 lab will probably be completed by January, but extensive renovations underway at the rest of the Biological Laboratories on Divinity Ave. will prevent scientists from using the lab until several months later, Leahy said.
Reconstruction Period
Macy D. Koehler, biohazards safety officer for the University, said yesterday unfinished construction at the Bio Labs includes renovation of several laboratories that were promised to recently arrived faculty members.
The air exhaust system in the building also needs to be revised, Koehler said.
NIH Inspected
Once the building is ready, National Institute of Health guidelines require that the P3 lab be inspected by a Faculty safety committee. The Cambridge Biohazards Committee, a group formed by the City Council last spring to monitor recombinant DNA research, will also inspect the facility.
Want to keep up with breaking news? Subscribe to our email newsletter.