News
Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties
News
Harvard College Students Report Favoring Divestment from Israel in HUA Survey
News
‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal
News
Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates
News
Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey
Depoluting the Charles River is going to cost lots of money--millions and millions--the Cambridge City Council was told yesterday.
One of the major problems that river side communities face is eliminating sewer lines that carry both rain water and waste material. During storms, these lines often overflow and carry untreated sewage into the Charles.
But the expense of replacing this single line with a dual system--one to carry the rain water, the other to carry the waste--can run into the millions, City Manager John J. curry '19 told the Council. He quoted an official of the Metropolitan District Commission as estimating that Boston would need $50 million to convert to a duel system.
Curry said that he had made no estimate of how much it would cost to change in Cambridge. About 20 per cent of the sewer lines carry both waste and storm water, he explained.
Want to keep up with breaking news? Subscribe to our email newsletter.