News

Garber Announces Advisory Committee for Harvard Law School Dean Search

News

First Harvard Prize Book in Kosovo Established by Harvard Alumni

News

Ryan Murdock ’25 Remembered as Dedicated Advocate and Caring Friend

News

Harvard Faculty Appeal Temporary Suspensions From Widener Library

News

Man Who Managed Clients for High-End Cambridge Brothel Network Pleads Guilty

Things Cracking In Vappi Village

NO WRITER ATTRIBUTED

An ominous hairline crack has developed in the concrete roof beam of a footbridge in the year-old multi-million-dollar married students dorms.

The footbridge connects the apartments in the low-rise building to the sixth floor of the west tower.

According to Dr. Othar Zaldastani, of Nichols, Norton and Zaldastani, construction engineers for the complex, the crack is probably due to the malfunction plates" in the footbridge which allow for expansion and contraction of the concrete.

Zaldastani conjectured that either there had been an "imperfect construction joint" or else the plates had frozen, causing the beam to crack.

A four-by-four brace has been applied to the inside of the passageway to help pinpoint the source of the trouble.

Most of the tenants seemed unconcerned by the quarter-inch fissure, a sample poll revealed.

A representative of Vappi & Co., construction agents for Peabody Terrace, said about the crack. "Maybe it is predictable. I don't know anything about it."

Carlo Mantini, superintendant of the buildings, had no comment to make on the situation.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags