News
Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties
News
Harvard College Students Report Favoring Divestment from Israel in HUA Survey
News
‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal
News
Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates
News
Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey
Ground-breaking ceremonies for the constructions of the new wing on the Harvard College Observatory will take place Monday at 11 a.m., Edward Reynolds '15, Administrative vice-President of the University, said yesterday. He further stated that all final contract arrangements for the $1 million computation center will be completed today with the Canter Construction Co.
Those who will be present at the include ceremonies will include Reynolds; Donald H. Menzel, Director of the College Observatory; Fred L. Whipple, Director of the Smithsonian Astrophysical Observatory; the architects from the firm of Griswold, Boyden, Wylde & Ames; and officials of the Department of Buildings and Grounds.
Completion Within a Year
Completion of the 40,000 square foot "F"-shaped structure is expected within a year. The four-story building with a glass and concrete facade will be connected to the rotunda of the present College Observatory.
New Computer Included
Within the new addition there will be complete office and laboratory space, as well as room for a new high-speed IBM 709 digital computer--a faster model than the one now used by the Smithsonian to track earth satellites.
Want to keep up with breaking news? Subscribe to our email newsletter.