News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Hollis Renovation Slated For Completion Next Fall

NO WRITER ATTRIBUTED

The Architects Collaborative will refinish and modernize the interior of Hollis Hall this summer. Plans for the renewal job (shown above) include restoration of original wood in the ceiling beams and wall panelling, and installation of new plumbing and wiring. Additional bookcases and closets will be included in the renovated rooms that house about 56 freshmen. Workmen will also modernize the bathrooms and re-do the floors.

Renovation of Hollis, which is the oldest Yard dormitory, follows work on Thayer North that was completed this spring. Thayer Middle and Thayer South will be modernized this summer along with Hollis. The newly renovated rooms will resemble those in Thayer North, but couch beds, recessed bookshelves, and sound-proofed walls are among several planned improvements.

The work, financed by a $2 million allotment from the Program for Harvard College, should be completed in time for occupancy by the Class of 1963 next fall. Edward Reynolds '15, Administrative vice-President, said recently that other freshman dormitories will be modernized in the next several years. Stoughton, Matthews, Grays, and Weld are being considered.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags