News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Workmen to Stay at Mt. Auburn Diggings

NO WRITER ATTRIBUTED

Workmen will continue excavating along Mt. Auburn St, for an indefinite period, a spokesman for the Cambridge Gas and Electric Company said last night.

So far, 13 holes have been dug between Linden and Holyoke Streets, most of them in front of Claverly Hall. The workmen are tightening joints on a 24 inch gas pipe, which sprung a leak several weeks ago and began to disturb residents of Claverly. A minute trickle of gas was escaping from the feed line into the basement of the dormitory through a conduit.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags