News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Improvements on Sidewalk Halted

NO WRITER ATTRIBUTED

Three members of the Leverett House Civic Improvement Society watched in agony yesterday as Cambridge workmen did dirt to their first big project.

On Monday the students--Thomas O. Nevison '51, Donald W. Ireland '52, and William V. H. Mason '51--altruistically built a thick gravel sidewalk over the swampland of upper Plympton Street, in front of the Harvard Auto Company.

Yesterday afternoon the City of Cambridge sent four men in a truck to tear down the temporary sidewalk and spread the gravel. Said the workmen: "It's dangerous. It's a menace."

Slosh Through Slush

Faced with another year of sloshing through mud ooze and runwater, the Society phoned the Cambridge Public Works Department and issued a formal complaint. Commissioner William R. McMenimen replied that he would look at the 12-foot strip this morning and decide whether to cover it with a stone-dust fill.

"If its a small job," the Commissioner said, "I'll tend to it myself.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags