Multimedia

In Photos: Harvard’s 373rd Commencement Exercises

News

Rabbi Zarchi Confronted Maria Ressa, Walked Off Stage Over Her Harvard Commencement Speech

News

Former Harvard President Bacow, Maria Ressa to Receive Honorary Degrees at Commencement

News

‘A’ Game: How Harvard Recruits its Student-Athletes

News

Interim Harvard President Alan Garber Takes the Political Battle to Washington

FAULTY FIXTURES FOUND IN HALF OF FRESHMAN ROOMS

NO WRITER ATTRIBUTED

More than half of the rooms in the Yard have defective wiring, it has been discovered as a result of the investigation new being carried on under the supervision of A. L. Endicott '94, comptroller of the University. The most common difficulties are spliced wires, cords fastened to the woodwork, and extensions longer than the legal length. Insufficiency of baseplugs, especially in the elder rooms, is the main cause of the trouble.

The repairs, which are being paid for by the students, average between $2 and $3. The inspection was ordered on account of the fire insurance, as it was probable that if no alterations were made, the cost of insurance would be increased, and the rooms would become more expensive.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags