News
After Court Restores Research Funding, Trump Still Has Paths to Target Harvard
News
‘Honestly, I’m Fine with It’: Eliot Residents Settle In to the Inn as Renovations Begin
News
He Represented Paul Toner. Now, He’s the Fundraising Frontrunner in Cambridge’s Municipal Elections.
News
Harvard College Laundry Prices Increase by 25 Cents
News
DOJ Sues Boston and Mayor Michelle Wu ’07 Over Sanctuary City Policy
Concrete piers are at present being put in between Kirkland House and the Master's Lodgings in preparation for a brick wall such as exists between the two units of Winthrop House. A gate will be installed to permit passage to the dining hall. The wall will be topped by an iron spiked fence.
Surveying of the Eliot House campus is now being carried on to prepare for the planting of shrubbery and a number of trees. It is expected that a flower bed will be laid alongside the brick terrace.
Want to keep up with breaking news? Subscribe to our email newsletter.