News
Ukrainian First Lady Olena Zelenska Talks War Against Russia At Harvard IOP
News
Despite Disciplinary Threats, Pro-Palestine Protesters Return to Widener During Rally
News
After 3 Weeks, Cambridge Public Schools Addresses Widespread Bus Delays
News
Years of Safety Concerns Preceded Fatal Crash on Memorial Drive
News
Boston to Hold Hearing Over Uncertain Future of Jackson-Mann Community Center
Concrete piers are at present being put in between Kirkland House and the Master's Lodgings in preparation for a brick wall such as exists between the two units of Winthrop House. A gate will be installed to permit passage to the dining hall. The wall will be topped by an iron spiked fence.
Surveying of the Eliot House campus is now being carried on to prepare for the planting of shrubbery and a number of trees. It is expected that a flower bed will be laid alongside the brick terrace.
Want to keep up with breaking news? Subscribe to our email newsletter.