News
Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties
News
Harvard College Students Report Favoring Divestment from Israel in HUA Survey
News
‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal
News
Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates
News
Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey
With the dismantling of the one remaining chimney well under way, the destruction of the Power Plant on Boylston Street is progressing rapidly.
At the present time the filling station that formerly stood on the corner of Boylston Street and Memorial Drive, has been taken down, and on that site a workman's shanty is being built, preparatory to the actual construction of House Unit 3 which is to begin in the near future. Inside the plant the machinery has disappeared, and workmen are busy tearing down the walls of the Plant itself.
Want to keep up with breaking news? Subscribe to our email newsletter.