News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
With the dismantling of the one remaining chimney well under way, the destruction of the Power Plant on Boylston Street is progressing rapidly.
At the present time the filling station that formerly stood on the corner of Boylston Street and Memorial Drive, has been taken down, and on that site a workman's shanty is being built, preparatory to the actual construction of House Unit 3 which is to begin in the near future. Inside the plant the machinery has disappeared, and workmen are busy tearing down the walls of the Plant itself.
Want to keep up with breaking news? Subscribe to our email newsletter.