News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

ENGINEERS START INITIAL WORK ON HOUSE UNIT NO. 4

NO WRITER ATTRIBUTED

Tests are now being made-of the soil in the plot at the corner of Mill and Plympton Streets in preparation for the building of House Unit No. 4. The consistency of the material must be known in order to prepare for laying the foundation.

The engineers have reported that difficulty is encountered at that location because of the high water level of the Charles River. The soil has been found to be thick clay, however, and the builders feel that no trouble will be caused by a weak base.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags