News
Garber Privately Tells Faculty That Harvard Must Rethink Messaging After GOP Victory
News
Cambridge Assistant City Manager to Lead Harvard’s Campus Planning
News
Despite Defunding Threats, Harvard President Praises Former Student Tapped by Trump to Lead NIH
News
Person Found Dead in Allston Apartment After Hours-Long Barricade
News
‘I Am Really Sorry’: Khurana Apologizes for International Student Winter Housing Denials
Tests are now being made-of the soil in the plot at the corner of Mill and Plympton Streets in preparation for the building of House Unit No. 4. The consistency of the material must be known in order to prepare for laying the foundation.
The engineers have reported that difficulty is encountered at that location because of the high water level of the Charles River. The soil has been found to be thick clay, however, and the builders feel that no trouble will be caused by a weak base.
Want to keep up with breaking news? Subscribe to our email newsletter.