News

Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties

News

Harvard College Students Report Favoring Divestment from Israel in HUA Survey

News

‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal

News

Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates

News

Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey

FINAL PROPERTY PURCHASED FOR BIOLOGICAL INSTITUTE

NO WRITER ATTRIBUTED

With the purchase of a small piece of property, the land on which the new $6,000,000. Biological Institute will be erected is entirely in the possession of the University. Surveys have already been made, and the plans are being drawn by the architects. It is hoped that the construction will be under way before the fall.

According to tentative arrangements, the new building will be in the general shape of the letter "L" extending back from Divinity Avenue and then parallel to the street. It will contain no lecture halls, as those in the Museum are ample. Instead, it will be devoted to laboratories, research rooms, and administrative offices.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags