News

Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties

News

Harvard College Students Report Favoring Divestment from Israel in HUA Survey

News

‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal

News

Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates

News

Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey

COOPERATIVE SOCIETY DIVULGES ARCHITECT'S PLANS FOR NEW QUARTERS TO BE COMPLETED BY MIDDLE OF NEXT SUMMER

NO WRITER ATTRIBUTED

By August of 1925 the Cooperative Society expects to have moved into its new building, located on the site of its former structure on Harvard Square.

Because of the limitation in width imposed by the size of the plot, present plans call for a vestibule in back of the columns of the new building which will contain two large show windows on either side. This will greatly improve the facilities for the display of merchandise which have been very inadequate in the present building.

The rear of the new structure has already been partially completed and the "Coop" will move into this annex shortly before Christmas. As soon as the transfer of merchandise has been accomplished wreckers will tear down the present building.

The new building will be the fourth place in which business has been done in the history of the Society, including Drury Hall on Brattle Square, Dane Hall and Lyceum Hall in which the Coop is now installed.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags