News
Supreme Court Justice Sotomayor Talks Justice, Civic Engagement at Radcliffe Day
News
Church Says It Did Not Authorize ‘People’s Commencement’ Protest After Harvard Graduation Walkout
News
‘Welcome to the Battlefield’: Maria Ressa Talks Tech, Fascism in Harvard Commencement Address
Multimedia
In Photos: Harvard’s 373rd Commencement Exercises
News
Rabbi Zarchi Confronted Maria Ressa, Walked Off Stage Over Her Harvard Commencement Speech
Word on a new Boston skating arena, where ice hockey, indoor track games, boxing matches and similar sport events may be staged, has been begun on St. Botolph street on the site of the old Boston Arena. The new building will be a concrete structure providing an ideal indoor skating surface of 220x90 feet, and with seating capacity of approximately 5000 spectators. These seats will be arranged so as to provide a particularly fine view of the games from all parts of the house, and include boxes around the oval. In addition there will be a standing capacity of 2000 people.
This arena will be used for college contests as well as professional games, and will be complete by November 1.
Want to keep up with breaking news? Subscribe to our email newsletter.