News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
The Randolph Gymnasium, which has been entirely remodelled during the summer, is to be completed and ready for use by the end of next week, according to information given out at the office of the Director of Physical Training. The greatest change that has been made in the building is that the main room which was formerly used as a tennis court or as a place for physical training classes has been divided into two floors on each of which are seven squash courts. The total of 14 courts will keep from 40 to 50 men busy at the same time. A few minor changes have been made, and the swimming pool and locker rooms are to be given a thorough cleaning before the building is open. It is planned to use this building during the months while outdoor exercise is still possible, in order to give exercise on rainy days to the Freshmen who are enrolled in physical training classes.
Want to keep up with breaking news? Subscribe to our email newsletter.