News
Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties
News
Harvard College Students Report Favoring Divestment from Israel in HUA Survey
News
‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal
News
Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates
News
Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey
The plans have just been announced for an armory to be built on the Yale Field, to be ready for use next fall at the beginning of college. The land is to be furnished by the University and the entire expense will be borne by the graduates. The buildings that will compose the armory will be two in number, The larger will consist of a drill hall, 100 by 210 feet, and several smaller rooms on each side, storage rooms for each battery, gun rooms, lockers, and a lecture room. The smaller building is to be used as a stable.
The two buildings are to be simple in appearance, the idea being to get the greatest capacity without a necessarily large expenditure.
Want to keep up with breaking news? Subscribe to our email newsletter.