News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

WORK ON NEW LABORATORY

To Begin This Spring.--High Tenston Experiments Possible.

NO WRITER ATTRIBUTED

The plans for the new electrical laboratory, which will be built between the Jefferson Physical Laboratory and Pierce Hall are nearing completion, and work on the building will begin sometime this spring. The building will cost between fifty and sixty thousand dollars and is a gift to the University, but the donor does not wish his name made public as yet.

The building will be equipped with all the latest high tension and high frequency electrical apparatus, including two 500,000 volt transformers. These are of the largest type of transformers made. There will also be a 60,000 volt storage battery.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags