News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Tech's New Buildings Under Way

NO WRITER ATTRIBUTED

The first pile of the foundations of Technology's new buildings on this side of the Charles has been driven. The past two weeks have witnessed much progress in the beginnings of construction. Three huge concrete-distributing towers have been set up and four more are to fellow. These are to be scattered over various sections of the grounds, from the Esplanade to the mechanical engineering and mining wings. The grading has been finished for the most part except on the athletic field.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags