News
News Flash: Memory Shop and Anime Zakka to Open in Harvard Square
News
Harvard Researchers Develop AI-Driven Framework To Study Social Interactions, A Step Forward for Autism Research
News
Harvard Innovation Labs Announces 25 President’s Innovation Challenge Finalists
News
Graduate Student Council To Vote on Meeting Attendance Policy
News
Pop Hits and Politics: At Yardfest, Students Dance to Bedingfield and a Student Band Condemns Trump
In dredging out the river-bed for the Cambridge pier of the new Stadium bridge, the workmen have come upon an old corduroy road, which probably served as the first bridge across the river in this vicinity. The road is remarkably well preserved, and the timber beyond being thoroughly watersoaked is otherwise in first-class condition. The logs extend down into the ground to a depth of twenty feet below the present river-bed.
Excellent progress is being made on the new bridge. Half of the old structure has already been demolished and about three-quarters of the dredging for the foundations of the Cambridge Pier has been done. The work of driving the piles for the pier will be begun the middle of next week and will require about five days. Special machinery has been devised to break up the ice on the river and thus prevent any delay to the work.
Want to keep up with breaking news? Subscribe to our email newsletter.