News
Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties
News
Harvard College Students Report Favoring Divestment from Israel in HUA Survey
News
‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal
News
Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates
News
Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey
Considerable progress was made in the construction of the Boston Arena during the Christmas recess. It is now thought that the skating rink will be flooded in time for the intercollegiate game between Dartmouth and Columbia on January 20. Five of the steel roof trusses have been swung into place and the brick walls on the south and east sides have been completed. The foundations for the ice plant have been laid and the columns of the lobby set up. Work on the lobby and the dressing rooms, however, will to be rushed until the rink and the enclosure is more nearly finished. It is expected that the entire structure will be completed toward the end of March.
Want to keep up with breaking news? Subscribe to our email newsletter.