News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Fast Progress on Boston Arena

NO WRITER ATTRIBUTED

The first of the enormous steel roof trusses was swung into place yesterday at the new Boston Arena on St. Botolph street. The width from end to end of the trusses will be 140 feet, and the height from the apex to the surface of the ice will be 75 feet.

The progress of construction for a building of this size has been remarkable. It is expected that the ice surface will be ready for use by January 15, although some of the minor details will not be completed until a fortnight later.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags