News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Charles River Dam Closed

NO WRITER ATTRIBUTED

The flow of the Charles River was stopped yesterday by the closing of the dam that has been under construction for several months near the Craigie Bridge. The cutting off of the river channel is to allow the construction of the main section of the permanent dam and roadway. It will be fully a year from now before the completion of the entire work can be observed, for after the dam is finished a roadway 100 feet wide is to be built along its top, serving as a permanent substitute for the old Craigie Bridge. The shutting off of the water will benefit rowing conditions, since the high water will increase the number of long stretches, and there will be no apparent current.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags