News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
A cinder running track is being built around Soldiers Field directly inside the fence. The track, which, it is hoped, will be finished next fall, will be a mile and a half long, and not less than 15 feet wide. This will afford an excellent opportunity for long runs both for members of the track team and for exercising squads.
The new cricket ground, about 700 feet by 500 feet, has been drained and is now being graded. It will not be ready for use until next fall.
Want to keep up with breaking news? Subscribe to our email newsletter.