News
Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties
News
Harvard College Students Report Favoring Divestment from Israel in HUA Survey
News
‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal
News
Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates
News
Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey
A cinder running track is being built around Soldiers Field directly inside the fence. The track, which, it is hoped, will be finished next fall, will be a mile and a half long, and not less than 15 feet wide. This will afford an excellent opportunity for long runs both for members of the track team and for exercising squads.
The new cricket ground, about 700 feet by 500 feet, has been drained and is now being graded. It will not be ready for use until next fall.
Want to keep up with breaking news? Subscribe to our email newsletter.