News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Improvements on Soldiers Field

NO WRITER ATTRIBUTED

A cinder running track is being built around Soldiers Field directly inside the fence. The track, which, it is hoped, will be finished next fall, will be a mile and a half long, and not less than 15 feet wide. This will afford an excellent opportunity for long runs both for members of the track team and for exercising squads.

The new cricket ground, about 700 feet by 500 feet, has been drained and is now being graded. It will not be ready for use until next fall.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags