News

Harvard Grad Union Agrees To Bargain Without Ground Rules

News

Harvard Chabad Petitions to Change City Zoning Laws

News

Kestenbaum Files Opposition to Harvard’s Request for Documents

News

Harvard Agrees to a 1-Year $6 Million PILOT Agreement With the City of Cambridge

News

HUA Election Will Feature No Referenda or Survey Questions

Hockey Rink Being Built in Stadium

NO WRITER ATTRIBUTED

The work on the hockey rink in the south end of the Stadium, to be used by the University hockey team during the winter, is almost completed. The rink is 180 feet long by 80 feet wide, and surrounded by a wooden wall four feet high, around which loam will be placed to prevent the water from leaking. As soon as settled cold weather begins, the rink will be flooded.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags