News
Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties
News
Harvard College Students Report Favoring Divestment from Israel in HUA Survey
News
‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal
News
Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates
News
Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey
The work of alteration in Hollis and Stoughton Halls has been carried on through the summer and is now nearly complete. Every room is furnished with hot water heating apparatus, and with hot and cold running water. On each floor in both entries, occupying the present bed-room space at the ends of the halls, a set of shower baths and lavatories has been installed; while porcelain bath tubs have been placed in the basements. In order to permit of bath room facilities on the first floor as well as the others, the west entry stairways have been modified to correspond with those in the east entries.
Densmore and LeClear of Boston are now making some alterations in the heating and ventilating plant in Sever Hall. All the old boilers have been taken out and three new 66-inch boilers put in, for heating both Sever Hall and Emerson Hall. An electric generator has also been installed; which will run ventilating fans in Sever, Robinson and Emerson Halls.
Want to keep up with breaking news? Subscribe to our email newsletter.