News
Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties
News
Harvard College Students Report Favoring Divestment from Israel in HUA Survey
News
‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal
News
Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates
News
Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey
The Engineering Journal for June is devoted entirely to a history of the building of the Stadium. The articles are contributed by the men in the Department of Engineering who have been most active in superintending the construction of the Stadium. These articles, together with a large numbers of views of the Stadium taken from various points and at various periods of construction, make the number one of unusual value. Professor U.N. Hollis, who had general charge of the building and plans has written an article on the history and purpose of the Stadium, and Professor L.T. Johnson, who had charge of the detail and construction has contributed an account of the engineering part of the work.
Copies, at fifty cents each, may be obtained at Thurston's Amee's, the Co-operative and at the Union, or application may be made by postal to 218 Pierce Hall.
Want to keep up with breaking news? Subscribe to our email newsletter.