News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
Progress on the tennis courts has been delayed by the frost and it will be impossible to have them in condition for play before next Wednesday. All the courts on Jarvis Field have been raked and fresh dirt added to make an even surface, but as the ground is still too soft for use, only two or three courts have been rolled. A new wire netting has been put in the centre backstop and the other two backstops are to be repaired. Work on the Holmes Field courts will be begun in about a week.
Want to keep up with breaking news? Subscribe to our email newsletter.