News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

New Crew Shells in Construction.

NO WRITER ATTRIBUTED

The University eight-oared shell for this year will be built by Hoyle of Ithaca, N. Y. Mr. Hoyle has several eight-oared boats in process of construction and from these the University shell; which will be delivered about May 1, is to be selected.

The frame-work of the Freshman shell is nearly completed. This boat, as well as the four-oared University shell, is being built by Frank E. Davy of Cambridge, it will be on the same lines as last year's boat with the exception of a slightly greater fullness in the bow and stern.

The Yale eight-oared and four-oared boats are both being constructed at Mr. Davy's shop and are completed with the exception of rigging. The eight-oar shell will be delivered about March 10.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags