News
After Court Restores Research Funding, Trump Still Has Paths to Target Harvard
News
‘Honestly, I’m Fine with It’: Eliot Residents Settle In to the Inn as Renovations Begin
News
He Represented Paul Toner. Now, He’s the Fundraising Frontrunner in Cambridge’s Municipal Elections.
News
Harvard College Laundry Prices Increase by 25 Cents
News
DOJ Sues Boston and Mayor Michelle Wu ’07 Over Sanctuary City Policy
A full-sized model in cross section of the proposed design for the new stadium has been built on the north stand on Soldiers Field. The model includes only the part designed for seats and does not represent the proposed covered promenade along the top of the stadium in back of the seats. It is executed in wood and is intended to test the angles, height and general appearance of the proposed design.
The small experimental stand of steel-concrete erected beside the east stand on the baseball field in January of last year has stood the test satisfactorily and a similar material will probably be used in the stadium.
The plans are being designed by Professor L. J. Johnson of the Division of Engineering in co-operation with Professor Hollis, and with the assistance of Mr. J. R. Worcester '82 of Boston, as consulting engineer, and of Mr. Charles F. McKim h.'90, of McKim, Meade & white, as consulting architect.
The plans of the stadium are being made the subject of careful study and special investigation because of the unusual character and magnitude of the structure. Several sets of preliminary plans have already been made and it is hoped to have the final plans completed this spring.
Want to keep up with breaking news? Subscribe to our email newsletter.