News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Class of 1885 Gate Nearly Completed.

NO WRITER ATTRIBUTED

The new 1885 gate and section of fence back of Sever Hall are almost completed. The mason work is entirely finished, and the iron grating is now being put in place. By next Saturday this work will be over, and only the painting of the bars will remain to be done. The grating will extend between all the eight posts except the two on the south end, between which a tree stands directly in the line. The space will be left open as an additional gate-way. McKim, Mead and White are the architects and Conroy and Wentworth the contractors for the gate.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags