News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
The new 1885 gate and section of fence back of Sever Hall are almost completed. The mason work is entirely finished, and the iron grating is now being put in place. By next Saturday this work will be over, and only the painting of the bars will remain to be done. The grating will extend between all the eight posts except the two on the south end, between which a tree stands directly in the line. The space will be left open as an additional gate-way. McKim, Mead and White are the architects and Conroy and Wentworth the contractors for the gate.
Want to keep up with breaking news? Subscribe to our email newsletter.