News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Artesian Well at Memorial Hall.

NO WRITER ATTRIBUTED

During the summer work has been in progress on an artesian well for Memorial Hall, and at a depth of 350 feet a flow of fifty gallons per minute has been secured. This water will be used for washing, and in the ice plant. It will not be used for drinking unless it is found pure and the consent of the Corporation is received. The use of the well will effect a large saving in the water bills which have hitherto been a considerable item in the expenses of the hall.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags