News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
The excavations for the new lecture hall have been practically completed, and the masonry work will begin this week. Several extensive changes have been made in the plans of the building. The lower part of the hall will be built of gray granite instead of limestone and brick. Limestone will be used, however, in the pillars, arches, and other decorations, the rest of the building being of dark red brick.
Want to keep up with breaking news? Subscribe to our email newsletter.