News
After Court Restores Research Funding, Trump Still Has Paths to Target Harvard
News
‘Honestly, I’m Fine with It’: Eliot Residents Settle In to the Inn as Renovations Begin
News
He Represented Paul Toner. Now, He’s the Fundraising Frontrunner in Cambridge’s Municipal Elections.
News
Harvard College Laundry Prices Increase by 25 Cents
News
DOJ Sues Boston and Mayor Michelle Wu ’07 Over Sanctuary City Policy
At the east end of the Rotch building on Holmes Field a one-story brick addition is being built, which will be used as a laboratory for the Mining and Metallurgy Department. The building will be a brick shell with a flat roof and will have a smoke-stack 50 feet high. It will be 79 feet long and 40 feet wide. The southern half will be fitted u with appliances for fire-work and will also have the new assay furnaces. In the northern half there will be a Reverberatory roasting furnace, a cupola furnace and a Bruckner revolving roaster, besides some gas furnaces and melting furnaces for illustrating the metallurgy of steel.
The outside shell will probably not be finished before Christmas. Mr. O. W. Longfellow is the architect and O. B. Burns the builder.
The machinery and fittings for the ore dressing laboratory in the old Rotch Building have arrived and will be put in as soon as possible.
Want to keep up with breaking news? Subscribe to our email newsletter.