News

Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties

News

Harvard College Students Report Favoring Divestment from Israel in HUA Survey

News

‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal

News

Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates

News

Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey

Rotch Building.

NO WRITER ATTRIBUTED

Work on the repairs to the Rotch Building to fit it up for a mining laboratory has progressed very satisfactorily. On the floor of the old baseball cage concrete bases have been put in position for the stamp mill and Huntington mill. Another room of the same area as the old cage will be built on the east end of the building and fitted up with assay furnaces and other mining apparatus. All repairs on the building will be completed by October 1.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags