News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Rotch Building.

NO WRITER ATTRIBUTED

Work on the repairs to the Rotch Building to fit it up for a mining laboratory has progressed very satisfactorily. On the floor of the old baseball cage concrete bases have been put in position for the stamp mill and Huntington mill. Another room of the same area as the old cage will be built on the east end of the building and fitted up with assay furnaces and other mining apparatus. All repairs on the building will be completed by October 1.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags