News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
Work on the repairs to the Rotch Building to fit it up for a mining laboratory has progressed very satisfactorily. On the floor of the old baseball cage concrete bases have been put in position for the stamp mill and Huntington mill. Another room of the same area as the old cage will be built on the east end of the building and fitted up with assay furnaces and other mining apparatus. All repairs on the building will be completed by October 1.
Want to keep up with breaking news? Subscribe to our email newsletter.