News

Community Safety Department Director To Resign Amid Tension With Cambridge Police Department

News

From Lab to Startup: Harvard’s Office of Technology Development Paves the Way for Research Commercialization

News

People’s Forum on Graduation Readiness Held After Vote to Eliminate MCAS

News

FAS Closes Barker Center Cafe, Citing Financial Strain

News

8 Takeaways From Harvard’s Task Force Reports

Radcliffe Gymnasium.

NO WRITER ATTRIBUTED

Excavations for the Radcliffe Gymnasium have been finished and the foundation is under way. The building will be ready for use next November. This is the first structure of much importance to be erected primarily for Radcliffe College, and its construction marks an era in the development of the institution.

The site of the new building runs along the Mason street front of the college grounds from the rear of Fay House extension to the city schoolhouse, at the corner of Mason and James streets. The building itself is to be 100 ft. by 53 on the ground, and two stories in height, with a light basement and will be of red brick with light stone trimmings. The third fioor will contain a running track. The other two will be occupied by the exercise room and lockers. There will be a large swimming tank in the basement.

Circulars have been sent to a number of graduates asking for subscriptions for the proposed new dormitory to cost about $50,000, to be built near the present college grounds. On account of the war, however, any systematic canvass of alumnae for funds has been indefinitely poetponed.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags