News

Ukrainian First Lady Olena Zelenska Talks War Against Russia At Harvard IOP

News

Despite Disciplinary Threats, Pro-Palestine Protesters Return to Widener During Rally

News

After 3 Weeks, Cambridge Public Schools Addresses Widespread Bus Delays

News

Years of Safety Concerns Preceded Fatal Crash on Memorial Drive

News

Boston to Hold Hearing Over Uncertain Future of Jackson-Mann Community Center

Radcliffe Gymnasium.

NO WRITER ATTRIBUTED

Excavations for the Radcliffe Gymnasium have been finished and the foundation is under way. The building will be ready for use next November. This is the first structure of much importance to be erected primarily for Radcliffe College, and its construction marks an era in the development of the institution.

The site of the new building runs along the Mason street front of the college grounds from the rear of Fay House extension to the city schoolhouse, at the corner of Mason and James streets. The building itself is to be 100 ft. by 53 on the ground, and two stories in height, with a light basement and will be of red brick with light stone trimmings. The third fioor will contain a running track. The other two will be occupied by the exercise room and lockers. There will be a large swimming tank in the basement.

Circulars have been sent to a number of graduates asking for subscriptions for the proposed new dormitory to cost about $50,000, to be built near the present college grounds. On account of the war, however, any systematic canvass of alumnae for funds has been indefinitely poetponed.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags