News

After Court Restores Research Funding, Trump Still Has Paths to Target Harvard

News

‘Honestly, I’m Fine with It’: Eliot Residents Settle In to the Inn as Renovations Begin

News

He Represented Paul Toner. Now, He’s the Fundraising Frontrunner in Cambridge’s Municipal Elections.

News

Harvard College Laundry Prices Increase by 25 Cents

News

DOJ Sues Boston and Mayor Michelle Wu ’07 Over Sanctuary City Policy

Soldiers Field Speedway.

NO WRITER ATTRIBUTED

Work has been started on the speedway and river drive across the Soldiers Field marshes. A railroad has been laid to be used in the operations and three dredging machines are now removing the material from the Charles, with which the dike and drives are to be built. A gang of men is putting down a system of piping to drain the marshes back of the dike.

The driveway is to be about 160 feet wide in all, with two separate drives, four sidewalks and a bicycle path. It will follow the river bank to a point opposite Longfellow Park, thence the speedway proper will extend straight to the abattoir, at the southwest corner of the field, a distance of about a mile. Enough ground will be allowed between the driveway and the river, just above the Boylston street bridge, for the proposed University boat house. It is not thought that these improvements on Soldiers Field will be entirely completed within two years.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags