News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
Work has been started on the speedway and river drive across the Soldiers Field marshes. A railroad has been laid to be used in the operations and three dredging machines are now removing the material from the Charles, with which the dike and drives are to be built. A gang of men is putting down a system of piping to drain the marshes back of the dike.
The driveway is to be about 160 feet wide in all, with two separate drives, four sidewalks and a bicycle path. It will follow the river bank to a point opposite Longfellow Park, thence the speedway proper will extend straight to the abattoir, at the southwest corner of the field, a distance of about a mile. Enough ground will be allowed between the driveway and the river, just above the Boylston street bridge, for the proposed University boat house. It is not thought that these improvements on Soldiers Field will be entirely completed within two years.
Want to keep up with breaking news? Subscribe to our email newsletter.