News
Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties
News
Harvard College Students Report Favoring Divestment from Israel in HUA Survey
News
‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal
News
Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates
News
Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey
Work has been started on the speedway and river drive across the Soldiers Field marshes. A railroad has been laid to be used in the operations and three dredging machines are now removing the material from the Charles, with which the dike and drives are to be built. A gang of men is putting down a system of piping to drain the marshes back of the dike.
The driveway is to be about 160 feet wide in all, with two separate drives, four sidewalks and a bicycle path. It will follow the river bank to a point opposite Longfellow Park, thence the speedway proper will extend straight to the abattoir, at the southwest corner of the field, a distance of about a mile. Enough ground will be allowed between the driveway and the river, just above the Boylston street bridge, for the proposed University boat house. It is not thought that these improvements on Soldiers Field will be entirely completed within two years.
Want to keep up with breaking news? Subscribe to our email newsletter.