News
Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties
News
Harvard College Students Report Favoring Divestment from Israel in HUA Survey
News
‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal
News
Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates
News
Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey
The Massachusetts Institute of Technology has begun work on a new five story, fire-proof building which it is hoped will be finished by the first of August. The building is to be 58 ft. by 161 ft. and will be situated on Trinity place, opposite the east end of the Art Museum. The departments of Architecture, Biology, Chemistry and Mechanical Engineering are to have new rooms in the building, so that the additional 48,000 square feet of room will indirectly help the other departments which are now overcrowded.
Want to keep up with breaking news? Subscribe to our email newsletter.