News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Two New Boats.

NO WRITER ATTRIBUTED

Next Monday, George Webb, the Worcester boat builder, will begin work upon a new shell for the Harvard eight, which is a radical departure from ordinary eight-oared shells in that it will be a round, full boat, carrying her lines to the extreme length of stem and stern. Mr. Webb intends to build from designs approved by Coach Watson, a boat that will weigh not more than two hundred pounds, and will carry 1350 pounds. It will be of Spanish cedar and 63 feet long, with a beam of 22 inches and an extreme depth of 13.25 inches. All the braces will be of cold drawn steel tube. The rigging will be Kern's. Mr. Webb and Mr. Hartwell have just finished one boat for the Harvard crews at South Boston, and the Worcester boat will be known as the freshman boat, but the 'varsity crew will have the choice of boats.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags