News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
As a full description of the changes in the gymnasium was made when the announcement Mr. Hemenway's gift first appeared in the CRIMSON, a brief description of the changes will suffice.
The addition will contain about 2,800 lockers which are arranged in four stories. The lockers are in alcoves like those of the Locker Building and will be the same kind as the latter. On the basement floor in the centre will be a large bath-room containing thirty-four showers. An asphalt court for Dr. Sargent's classes is being laid out in the rear of the building.
Work on the building has been much delayed by a general strike of steamfitters, and it will be some time before it can be completed. In the meantime no lockers can be assigned.
Want to keep up with breaking news? Subscribe to our email newsletter.