News
Garber Privately Tells Faculty That Harvard Must Rethink Messaging After GOP Victory
News
Cambridge Assistant City Manager to Lead Harvard’s Campus Planning
News
Despite Defunding Threats, Harvard President Praises Former Student Tapped by Trump to Lead NIH
News
Person Found Dead in Allston Apartment After Hours-Long Barricade
News
‘I Am Really Sorry’: Khurana Apologizes for International Student Winter Housing Denials
The new chemical laboratory which is being built at the University of Pennsylvania is very near completion. It will have two wings of two stories each and a central building of three stories. In equipment it will be one of the most complete buildings of its kind among the colleges.
There will be several laboratories for the analysis of steel and iron, assaying, qualitative work, and the like. A large room with a seating capacity of 220 will be used as a lecture room, and there will also be a museum, a library, and a reading room. Private offices will also be fitted for the instructors, with laboratories attached.
Want to keep up with breaking news? Subscribe to our email newsletter.