News
Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties
News
Harvard College Students Report Favoring Divestment from Israel in HUA Survey
News
‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal
News
Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates
News
Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey
The new chemical laboratory which is being built at the University of Pennsylvania is very near completion. It will have two wings of two stories each and a central building of three stories. In equipment it will be one of the most complete buildings of its kind among the colleges.
There will be several laboratories for the analysis of steel and iron, assaying, qualitative work, and the like. A large room with a seating capacity of 220 will be used as a lecture room, and there will also be a museum, a library, and a reading room. Private offices will also be fitted for the instructors, with laboratories attached.
Want to keep up with breaking news? Subscribe to our email newsletter.