News
Harvard Quietly Resolves Anti-Palestinian Discrimination Complaint With Ed. Department
News
Following Dining Hall Crowds, Harvard College Won’t Say Whether It Tracked Wintersession Move-Ins
News
Harvard Outsources Program to Identify Descendants of Those Enslaved by University Affiliates, Lays Off Internal Staff
News
Harvard Medical School Cancels Class Session With Gazan Patients, Calling It One-Sided
News
Garber Privately Tells Faculty That Harvard Must Rethink Messaging After GOP Victory
An important acquisition is soon to be made to the scientific department of Cornell by the gift of $50,000 from Hiram W. Sibley, Rochester, N. Y., for the erection of a new building. The structure will be 160 x 46 feet in dimension, and four stories high, with a well lighted basement. The first floor will be devoted to the museum, and the illustrative apparatus. There will be, besides, a large lecture-room and class-room. The second floor will be used largely for the department of Marine Engineering and Naval Architecture, and will contain two large draughting rooms, a lecture room and two offices. The third floor will contain two draughting rooms, and an office. It is estimated that the building will accommodate 400 students. The architectural work has been done by Professor C. Francis Osborn assistant Professor of Arcitecture in the University. Work will be begun upon the Sibley Building at once and it is expected that it will be ready for occupancy a year from next September.
Want to keep up with breaking news? Subscribe to our email newsletter.