News
After Court Restores Research Funding, Trump Still Has Paths to Target Harvard
News
‘Honestly, I’m Fine with It’: Eliot Residents Settle In to the Inn as Renovations Begin
News
He Represented Paul Toner. Now, He’s the Fundraising Frontrunner in Cambridge’s Municipal Elections.
News
Harvard College Laundry Prices Increase by 25 Cents
News
DOJ Sues Boston and Mayor Michelle Wu ’07 Over Sanctuary City Policy
The work on the new Yale Medical School building is progressing rapidly and it is expected that the building will be completed before commencement. It is a plain three-story brick structure, forty by seventy feet in dimension. The building will be devoted to the department of chemistry and physiology and will nearly double the capacity of the school. On the first floor are two working laboratories in chemistry, one being devoted to general chemistry and the other to medical chemistry. The first floor also contains students' working laboratories and stock-rooms. The second floor is given up to lecture rooms in chemistry, with a laboratory of sanitary chemistry, and a private laboratory for the use of the professor. The third floor contains a lecture room in physiology, a general working laboratory, a library room, and several private room for the professors. Each of the lecture rooms has two smaller rooms attached for apparatus and preparation for lectures. The building will be ready for the use of classes next fall.
Want to keep up with breaking news? Subscribe to our email newsletter.