News

Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil

News

Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum

News

Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta

News

After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct

News

Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds

Sheffield Building at Yale.

NO WRITER ATTRIBUTED

The new mechanical engineering building for the Yale Scientific School has been delivered by the contractors for occupation. The entrance of the building is the only part not yet finished. The furniture which is of cherry settees and large hard pine tables, have been put in and all the machinery for the mechanical department is in position and ready for immediate use. It is expected that the entrance will be completed in about two weeks, when the building will be formally opened.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags