News
Harvard Medical School Cancels Student Groups’ Pro-Palestine Vigil
News
Former FTC Chair Lina Khan Urges Democrats to Rethink Federal Agency Function at IOP Forum
News
Cyanobacteria Advisory Expected To Lift Before Head of the Charles Regatta
News
After QuOffice’s Closure, Its Staff Are No Longer Confidential Resources for Students Reporting Sexual Misconduct
News
Harvard Still On Track To Reach Fossil Fuel-Neutral Status by 2026, Sustainability Report Finds
Everything is now completed in the Cary Gymnasium, but the time remaining is so short that it will probably not be thrown open until next Fall. There are about one hundred lockers in all, a part being on the first floor near the base ball cage, and the remainder on the second floor. On the top floor is a small room containing a large closet fitted up with numerous pegs, which are to be used for drying purposes, open to all. Connecting with the three floors is a dumb waiter, running up from the bath-rooms on the first floor, by means of which clothing can be raised or lowered to the different floors. A large revolving fan is fixed in the basement, by which air, either hot or cold, is conducted through the building, there being no steam pipes. The plumbing, which has been done by a Cambridgeport firm, is an admirable piece of work. The water in the rowing tank has been allowed to run out and at present it stands empty.
Want to keep up with breaking news? Subscribe to our email newsletter.