News
Harvard Researchers Develop AI-Driven Framework To Study Social Interactions, A Step Forward for Autism Research
News
Harvard Innovation Labs Announces 25 President’s Innovation Challenge Finalists
News
Graduate Student Council To Vote on Meeting Attendance Policy
News
Pop Hits and Politics: At Yardfest, Students Dance to Bedingfield and a Student Band Condemns Trump
News
Billionaire Investor Gerald Chan Under Scrutiny for Neglect of Historic Harvard Square Theater
The plans for the new Yale gymnasium are completed. In the basement, which will be the heaviest ever built in New Haven, will be situated two rowing tanks, each 24 x 52 feet, and the swimming tank, 25 x 50 feet. Three bowling alleys, twelve bath rooms, and the steam heating apparatus will occupy the rest of the basement. On the first floor will be the large vestibule, trophy room, rooms fitted with shower baths, and a massage room. The main gymnasium room will be on the second floor, and the running track will be suspended between this floor and the roof. The roof will be mainly of glass with trap ventilators.
Want to keep up with breaking news? Subscribe to our email newsletter.