News
Garber Announces Advisory Committee for Harvard Law School Dean Search
News
First Harvard Prize Book in Kosovo Established by Harvard Alumni
News
Ryan Murdock ’25 Remembered as Dedicated Advocate and Caring Friend
News
Harvard Faculty Appeal Temporary Suspensions From Widener Library
News
Man Who Managed Clients for High-End Cambridge Brothel Network Pleads Guilty
The plans for the new Yale gymnasium are completed. In the basement, which will be the heaviest ever built in New Haven, will be situated two rowing tanks, each 24 x 52 feet, and the swimming tank, 25 x 50 feet. Three bowling alleys, twelve bath rooms, and the steam heating apparatus will occupy the rest of the basement. On the first floor will be the large vestibule, trophy room, rooms fitted with shower baths, and a massage room. The main gymnasium room will be on the second floor, and the running track will be suspended between this floor and the roof. The roof will be mainly of glass with trap ventilators.
Want to keep up with breaking news? Subscribe to our email newsletter.