News

Community Safety Department Director To Resign Amid Tension With Cambridge Police Department

News

From Lab to Startup: Harvard’s Office of Technology Development Paves the Way for Research Commercialization

News

People’s Forum on Graduation Readiness Held After Vote to Eliminate MCAS

News

FAS Closes Barker Center Cafe, Citing Financial Strain

News

8 Takeaways From Harvard’s Task Force Reports

The New Boat House.

NO WRITER ATTRIBUTED

The new boat house is entirely covered in and the men are engaged in putting in the windows. The studding for the partitions are in place and the arrangement of the upper floor can now be plainly seen. A long hall with lockers around the four sides will occupy most of the floor, the space on each side of the stairway being used for bathrooms. The lower floor will be devoted to the storing of boats. Two large doors open from this floor out onto a large platform from which the floats are reached. Over this platform is a long balcony on which the hall upstairs opens. The boathouse will be finished the last of March or the first of April.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags