News

Summers Will Not Finish Semester of Teaching as Harvard Investigates Epstein Ties

News

Harvard College Students Report Favoring Divestment from Israel in HUA Survey

News

‘He Should Resign’: Harvard Undergrads Take Hard Line Against Summers Over Epstein Scandal

News

Harvard To Launch New Investigation Into Epstein’s Ties to Summers, Other University Affiliates

News

Harvard Students To Vote on Divestment From Israel in Inaugural HUA Election Survey

The New Boat House.

NO WRITER ATTRIBUTED

The new boat house is entirely covered in and the men are engaged in putting in the windows. The studding for the partitions are in place and the arrangement of the upper floor can now be plainly seen. A long hall with lockers around the four sides will occupy most of the floor, the space on each side of the stairway being used for bathrooms. The lower floor will be devoted to the storing of boats. Two large doors open from this floor out onto a large platform from which the floats are reached. Over this platform is a long balcony on which the hall upstairs opens. The boathouse will be finished the last of March or the first of April.

Want to keep up with breaking news? Subscribe to our email newsletter.

Tags