News
Harvard Grad Union Agrees To Bargain Without Ground Rules
News
Harvard Chabad Petitions to Change City Zoning Laws
News
Kestenbaum Files Opposition to Harvard’s Request for Documents
News
Harvard Agrees to a 1-Year $6 Million PILOT Agreement With the City of Cambridge
News
HUA Election Will Feature No Referenda or Survey Questions
The new boat house is entirely covered in and the men are engaged in putting in the windows. The studding for the partitions are in place and the arrangement of the upper floor can now be plainly seen. A long hall with lockers around the four sides will occupy most of the floor, the space on each side of the stairway being used for bathrooms. The lower floor will be devoted to the storing of boats. Two large doors open from this floor out onto a large platform from which the floats are reached. Over this platform is a long balcony on which the hall upstairs opens. The boathouse will be finished the last of March or the first of April.
Want to keep up with breaking news? Subscribe to our email newsletter.