News
Garber Announces Advisory Committee for Harvard Law School Dean Search
News
First Harvard Prize Book in Kosovo Established by Harvard Alumni
News
Ryan Murdock ’25 Remembered as Dedicated Advocate and Caring Friend
News
Harvard Faculty Appeal Temporary Suspensions From Widener Library
News
Man Who Managed Clients for High-End Cambridge Brothel Network Pleads Guilty
The new boat house is entirely covered in and the men are engaged in putting in the windows. The studding for the partitions are in place and the arrangement of the upper floor can now be plainly seen. A long hall with lockers around the four sides will occupy most of the floor, the space on each side of the stairway being used for bathrooms. The lower floor will be devoted to the storing of boats. Two large doors open from this floor out onto a large platform from which the floats are reached. Over this platform is a long balcony on which the hall upstairs opens. The boathouse will be finished the last of March or the first of April.
Want to keep up with breaking news? Subscribe to our email newsletter.