News
Garber Privately Tells Faculty That Harvard Must Rethink Messaging After GOP Victory
News
Cambridge Assistant City Manager to Lead Harvard’s Campus Planning
News
Despite Defunding Threats, Harvard President Praises Former Student Tapped by Trump to Lead NIH
News
Person Found Dead in Allston Apartment After Hours-Long Barricade
News
‘I Am Really Sorry’: Khurana Apologizes for International Student Winter Housing Denials
At last popular opinion is being listened to and as a result a number of new lockers are being put up in the Gymnasium.
The new lockers to the number of between 120 and 130 will almost fill the space in the basement between the two staircases leaving only room for a passage way. The material for the work is now at the Gymnasium ready to fit together and be put up, which will occupy only a short time, so that the lockers will probably be ready in about two weeks. There are now nearly one hundred and twenty men on the waiting list for lockers, and probably by the time the lockers are finished the number of men waiting will have reached the number of new lockers.
Want to keep up with breaking news? Subscribe to our email newsletter.